elaola Posted March 5, 2019 Share Posted March 5, 2019 Is it possible to move the bedrock level higher up? So you will hit it much sooner and having a base underground will be much tougher. I have looked in the biomes.xml, but I really can't figure out how to change it. If it really is possible? Link to comment Share on other sites More sharing options...
Guppycur Posted March 5, 2019 Share Posted March 5, 2019 The biomes acts backwards, from top down, so change the top layers depth and instead of stone going to *, give it a number. ...this post is going from memory so is subject to being wrong. Link to comment Share on other sites More sharing options...
elaola Posted March 6, 2019 Author Share Posted March 6, 2019 Thanks! Gonna test it today. Link to comment Share on other sites More sharing options...
cammel Posted March 7, 2019 Share Posted March 7, 2019 In 17.1 b9 I changed this line in the rwgmixer: <terrain_generator name="vanilla" base_height="32" water_level="38"> to <terrain_generator name="vanilla" base_height="52" water_level="58"> Do not know if it works 17.2 b27. I make my maps in 17.1 b9 Link to comment Share on other sites More sharing options...
xxx73 Posted April 1, 2019 Share Posted April 1, 2019 will this also work the other way, lowering bedrock so there is more space to dig? Link to comment Share on other sites More sharing options...
Guppycur Posted April 2, 2019 Share Posted April 2, 2019 Nope Link to comment Share on other sites More sharing options...
xxx73 Posted April 2, 2019 Share Posted April 2, 2019 thats not good news. I thought if raising the landscape, it would be longer to bedrock (+3 meter), if this don't work, is there some other way to lower bedrock, to increase digging space to something similar to what it was like in A16? Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.