Raptortwenty2 Posted December 10, 2021 Share Posted December 10, 2021 I feel like the whole point of concrete was like the risk that was required when you used it therefore the drying phase would have to be started a day in advance or else you’d be caught out on horde night 2 Link to comment Share on other sites More sharing options...
Kosmic Kerman Posted December 10, 2021 Share Posted December 10, 2021 This was only true on your first base. After you learned your lesson the first time, you could just build your base before the horde. The biggest pain with wet concrete was having to stay in the chunk so that it would dry. It was really more of an annoyance than a contributor to tension. You can always simulate this by waiting until the last minute to build your base though. 1 Link to comment Share on other sites More sharing options...
BFT2020 Posted December 10, 2021 Share Posted December 10, 2021 1 hour ago, Kosmic Kerman said: The biggest pain with wet concrete was having to stay in the chunk so that it would dry. 👍 to this. Nothing was more frustrating on upgrading your base than to realize that things didn't dry in time because you were away the entire time. Link to comment Share on other sites More sharing options...
Urban Blackbear Posted December 10, 2021 Share Posted December 10, 2021 I work in highway construction and I can assure you that the USDOT does not consider unobserved concrete to be curing. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now